Public Comment Form

Mohave Energy Park (AEPCO)

NOTICE OF PRELIMINARY DECISION TO ISSUE AN INDIVIDUAL AQUIFER PROTECTION PERMIT


Mohave Energy Park (MEP) is a new peaking natural gas-fired electric generating facility located in Mohave Valley, Arizona. MEP will operate up to four natural gas-fired, simple-cycle, LM6000 combustion turbine generators (CTG), each capable of producing approximately 49 megawatts of electricity. Excess water generated as a byproduct of reverse osmosis (RO) treatment of raw water will be stored and evaporated within an 8.3-acre, two-cell lined Evaporation Pond located on site. AEPCO anticipates a facility lifespan of approximately 40 years.




Contact Information

*Indicates Required Fields

Submitted by Value

First Name

Last Name

Address

City

State

ZIP

Email

Your Comment


You can view the documents online by finding this notice in the list on azdeq.gov/PublicNotices.


The documents are also available at the ADEQ Records Center. Call 602-771-4380 to make an appointment, or visit the Records Center located at 1110 West Washington Street, Phoenix, Arizona. Learn more at azdeq.gov/records.

The comment period began August 26, 2026. In response to a request for a public hearing, ADEQ will be extending the comment period until October 30, 2026. Comments must be received or postmarked by October 30, 2026 to be considered.
 
A public hearing will be held on Wednesday, October 7, 2026 from 6:00 PM until 8:00 PM at the Mohave Valley Fire Department, located at 1451 Willow Drive, Mohave Valley, AZ 86440.


*Uploading a file is optional*

You may attach up to five 20 MB files to accompany your submission. Allowed formats are pdf, jpg, jpeg, png, txt, gif, doc, docx, xlsx, xls. If you experience technical difficulties submitting your comment please contact the person listed at the bottom of this page.